Instant project estimate
Your project, priced
line by line.
No sales calls to get a number. Scope your project with our AI assistant and get an honest estimate, priced line by line, with a real start date. In any language.
- Days and rate on every line
- Estimate in ~3 minutes
- Reviewed by an engineer before any contract
< 24 h
from your estimate to the formal quotation, reviewed by an engineer
D+14
your earliest start: a real date, honored
0
hidden margin: every line shows its days and its rate
- 01 Project
- 02 Scope
- 03 Context
- 04 Describe
- 05 Verify
- 06 Estimate
What are we building?
How it works
Describe
Guided form plus free text, in any language.
Get challenged
Our AI asks the questions a senior engineer would, and pushes back when scope is unrealistic.
Receive the estimate
Line-by-line breakdown, total, and a real start date. By email too, with the formal quote after human review.
Questions & straight answers
Is the estimate binding?
No. It is an honest indication, priced line by line. The formal quotation follows after an engineer reviews the scope, usually within one business day.
How is my quote priced?
Line by line. Each line shows the role, the number of days and the day rate applied, so you see how the total is built and not just the total. Rates vary with the specialty a line needs, and the estimate names the role it assumed.
Can I do this in my language?
Yes. Describe your project in any language, the assistant follows you. Quote documents are produced in French or English, whichever you prefer.
What happens with my email?
It receives the verification code and your estimate, and creates your file in our CRM. No newsletter, no resale, GDPR-governed.
When can you actually start?
Planning starts at the earliest two weeks after your request, and the estimate shows the real date. If a slot opens sooner, we tell you on the call.
Why are your rates lower than a local agency's?
Because our structure is different. Steering and contracts stay in Belgium and Switzerland, engineering capacity is in Rabat, where we hire and train our engineers for the long run. The quality bar is identical. The cost structure is not, and that difference goes back into your budget.

